Place of Origin:
CHINA
Brand Name:
DONJOY
Certification:
CE/FDA/ISO/3A
Contact Us
DONJOY hygienic stainless steel sus316 2" tank cleaning equipment rotary 360° jet head
Quick Detail
Cleaning Ball
Nozzle Size:4mm,5mm, 6mm,7mm,8mm
Connection: 1",1.5",2" BSP or NPT Thread,Clamp
Materials : 1.4404 ( SS316L)
Specification
Product Name: |
rotary jet head 360°,tank cleaner |
Material: |
SUS316L;PTFE |
Flow: |
4-45m³/h |
Inlet Pressure: |
4-10 bar |
Suggest Pressure: |
6 bar |
Available size: |
1.5"-DN40 |
Connection way: |
thread BSP, clamp |
Max temperature: |
95°C |
Max environment temperature: |
140°C |
Application Scope: |
Widely used in food and dairy products, Pharmaceutical, Chemical treatment, Transport equipment, Beverage |
Typical application: |
process containers and reactor; tank; transport irrigation equipment; fermentation; yeast breeding |
Advantages: |
Self-cleaning; low liquid consumption; heath design |
Typical cleaning methods: |
fixed installation CIP system |
Packaging Details: |
Bubble pack for each. Outside packing are carton or plywood cases. Or as per the request of customers. |
Delivery details: |
Usually within 20 days after receiving T/T down payment. |
Drawing
Typical Application
1.Fixed installation CIP System
2.Process Containers and reator
3.Store tank
4.Transport tank equipment
5.Fermentation
6.Yeast Breeding
Operating Principle
1. Rotary injector is Hygenic tank cleaner, with 360degree coverage in a given tank or process container, the rotary jet head is driven by flow liquid through impeller in the pressure and flow increase will increase the length of the jet and the impact to the tank or vessel surface
2. Rotary injector with unique self-cleaning function, internal is completely cleaning.
Technical Parament
1. Flow: 4-45T/H
2.Inlet Pressure:4-10Bar
3.Suggest Temperature: 95 Degree
4.Connection: BSP,1.5"-DN40
5.Gasket Materials: PTFE
6.Lubrication: Cleaning Medium
Common application:
FAQ
1,How to pay?
We accept the payment via ESCROW, T/T (bank transfer) and Western Union, please inquire us about the details in advance.
2,How long about the production lead time?
Different products and quantities have different procedures and different timing, normally it needs about 7-14 working days.
3, How to Deliver?
By air, by sea or by express(Fedex, DHL, UPS, TNT etc)
If you need anything more detail, please do not hesitate to contact us.
Send your inquiry directly to us